Phase-aware scheduling

Your practiceruns on meetings.Shouldn't they runthemselves?

Schematic replaces email ping-pong and double-booked site visits with a single scheduling engine wired to your project phases — from SD through CA.

22s

avg booking time

0

double-bookings

340+

studios onboarded

Studio principal 1Studio principal 2Studio principal 3Studio principal 4

340+ studios already running on Schematic

schematic.studio / practice-view
LIVE

Active Projects

Q1 2026 — 14 Projects

Phase-Linked ✓

Next 24 Hours

08:30

Meridian Tower — Site Visit

CD phase

CONFIRM
11:00

Holloway Residence — DD Review

DD phase

CONFIRM
14:15

Planning Authority — Permit Mtg

SD phase

CONFIRM
16:45

Crit Session — Studio All-Hands

CA phase

CONFIRM
0 conflicts detected↑ 4 auto-confirmed today

Spec Sheet

The gap between then and now.

Four pain points every architecture studio recognizes. Side by side with what they look like inside Schematic.

01

Consultation Intake

SD / Pre-Design

Before Schematic

The Email Spiral

  • 3–5 days of back-and-forth to find a slot
  • Client drops off mid-thread, restarts cold
  • No intake form, notes live in Gmail drafts
  • Double-booked when DD review shifts

4.2 days

avg time to book one intake call

With Schematic

One Link, Done

  • Client self-books in 22 seconds via branded link
  • Intake questionnaire collected before the call
  • Auto-syncs to project phase in Schematic
  • Conflict-checked against all active projects

22 sec

avg booking time, zero back-and-forth

02

Contractor Coordination

DD / CD Phase

Before Schematic

The Group Text Problem

  • Structural, MEP, and civil on separate threads
  • Site visit time decided by whoever replies last
  • No-shows with no automated follow-up
  • Rescheduling restarts the whole chain

2.1 hrs

lost per week per associate to contractor scheduling

With Schematic

Multi-Party, One View

  • All consultants see phase-linked availability
  • Site visits auto-blocked for travel buffer
  • 48-hour automated confirmation reminders
  • Rescheduling propagates to all parties instantly

0 hrs

manual coordination — fully automated

03

Planning Authority Meetings

SD / Permit

Before Schematic

The Calendar Gamble

  • Council slots filled weeks out, no waitlist logic
  • Principal manually checks availability each time
  • Meeting prep documents emailed separately
  • Rescheduled by council with no auto-notify

11 days

avg lead time to confirm a planning meeting

With Schematic

Phase-Timed Automatically

  • Schematic monitors council calendar for openings
  • Books the earliest slot aligned to permit phase
  • Prep checklist attached to confirmation email
  • Council reschedules trigger instant team alerts

3 days

avg lead time with automated slot monitoring

04

Internal Design Reviews

DD / CA Phase

Before Schematic

The Crit Session Chase

  • Associate sends Doodle, waits 48 hrs for responses
  • Principal unavailable — meeting pushed again
  • No connection to project milestone dates
  • Crit notes in a shared doc nobody updates

2 hrs/wk

per associate lost to internal scheduling overhead

With Schematic

Milestone-Locked Reviews

  • Crit sessions auto-scheduled at phase milestones
  • Principal's protected focus blocks respected
  • Review date locked to deliverable deadline
  • Action items captured and linked to next phase

8 min

avg time to lock a crit session across the studio

By The Numbers

Evidence, not promises.

0s

Average booking time

From link open to confirmed slot

0

Double-bookings

Across all active projects

0+

Studios onboarded

Across 12 countries

0h

Hours saved per week

Per associate architect

0%

Confirmation rate

With automated reminders

0

Faster phase transitions

SD → DD → CD → CA

"We cut our weekly scheduling overhead from 9 hours to under 45 minutes. Every contractor, every planning meeting, every crit — one system, zero chaos."
Nadia Chen, principal architect at Chen & Holloway Studio

Nadia Chen

Principal — Chen & Holloway Studio, San Francisco

Scheduling overhead
9 hrs/wk45 min/wk
Contractor no-shows
3–4 / month0 in 6 months
Intake-to-booked
4.2 days22 seconds

Integrations

Fits into your existing
stack in 4 minutes.

Schematic reads your existing calendar, imports project phases from your BIM tool, and starts blocking time correctly — no migration, no manual setup.

Live Demo

Connect your Google or Outlook calendar and see how Schematic would reorganize your next 30 days by project phase.

Read-only preview. No data stored. No account required.

SOC 2 Type II · GDPR compliant · End-to-end encrypted

Google Calendar

Native sync

Outlook / M365

Bi-directional

Apple Calendar

iCal feed

Zoom

Auto-generate links

Microsoft Teams

Meeting rooms

Revit

Phase import

ArchiCAD

Phase import

Procore

Site visit sync

Get Started

Your practice in full command.

Three fields. No friction. We'll show you what Schematic looks like inside your specific practice size and toolset.

schematic.studio / onboard
Free 14-day trial · No credit card

No credit card · Cancel anytime · Setup in 4 minutes